CAPA College, Wakefield
Funded by the DfE Framework, CAPA College is a new Performing Arts College, offering unique specialist provision for 500 students. The vision is to create an outstanding 16-19 Free School…
Adept have a reputation for working effectively within the sensitive environments of Education projects.
Working on time and on budget, Adept have demonstrated their expertise and design sensitivity surrounding effective academic construction, including builds during which the school is still operational.
Funded by the DfE Framework, CAPA College is a new Performing Arts College, offering unique specialist provision for 500 students. The vision is to create an outstanding 16-19 Free School…
The new 8-form-entry secondary school is required to meet the demand for places in the growing local community. Three new buildings are planned in this phased development which comprises a…
The project involved the extension and refurbishment of an existing Grade II Listed 5 storey reinforced concrete framed building. Adept were appointed to undertake detailed civil and structural design works….
The delivery of a two storey steel frame extension to the existing dining hall to create additional 150m2 double height dining area space and additional 720m2 of classrooms and office…
The extension provides two storeys of teaching accommodation linked on both floors to the main school building at Park Spring Primary School. This provided new classrooms and associated amenity and…
The expansion of the award winning Sixth Form College in Scunthorpe involved the construction of a new two-storey learning centre for Performing Arts, Music and ICT with an integrated single…
The project involved the extension of the existing primary school in Malton. The £3m build delivered a single-storey teaching block for pupils aged 11-14 years. It also included a school…
The project delivered a steel framed two storey new build primary school with three sets of external stairways linking the school between spilt levels. New external space was created and…
The project consisted of the extensive £4m redevelopment of the school’s sports facilities. The facilities include eight outdoor cricket lanes with various artificial surfaces, one and a half new hockey…
Adept play a key role in delivery of a £4.5m extension and refurbishment project at Hunslet Moor Primary School. The project allowed the school to increase its intake from 45…