Sands Lane, Holme-On-Spalding-Moor
Adept were asked to provide civil engineering design for the construction of 23 new dwellings on farm land off Sands Lane in Holme-On-Spalding-Moor. Adept were appointed by Synergy Housing to…
All our Residential projects
Adept were asked to provide civil engineering design for the construction of 23 new dwellings on farm land off Sands Lane in Holme-On-Spalding-Moor. Adept were appointed by Synergy Housing to…
Adept provided civil and structural engineering solutions to this eminent development of residential accommodation converted from office space owned by the Duchy of Lancaster. The project included refurbishment of the…
Kirklees Council and Kirklees Neighbourhood Housing (KNH) embarked on a £3.7m project to refurbish Huddersfield’s former Richmond Flats to create the iconic Harold Wilson Court. It involved the complete remodelling…
Adept were appointed by Home Group to provide civil engineering expertise during this £5million project involving the construction of forty six residential dwellings located upon a cliff top overlooking Valley…
The project involved the refurbishment of the historically important Algernon Firth building in the centre of Leeds. The building was originally constructed in 1933 and architecturally is one of the…
To assist the contractor, Strategic Team Group, during the tender process and throughout the development of 26 properties, consisting of bungalows, 2, 3 and 4 bedroom houses on a site…
To construct 27 family-sized homes as part of the first phase development of the site, 19 of which were made available for rent by Incommunities with the remainder retained for…
To develop a derelict Victorian building and construct two new buildings, both two storeys high, one with an additional semi-basement level as part of a new social housing scheme. The…
To construct a new, large, two-storey detached, timber-framed house on the site of an existing 1930s property. The client’s aspiration was to construct a high specification sustainable building with long…
The brief was to provide civil and structural engineering services for a restoration project within a conservation and green belt area to rebuild a fire destroyed, Grade II listed canal side…