ADEPT CSCE
  • Home
  • Projects
  • News
  • Team
  • Technology
  • BIM
  • Services
  • Net-Zero
  • Awards
  • Social Value
  • Careers
  • Contact

Sport & Leisure

Back to Leisure & Hospitality

Bradford Grammar School, Bradford

The project consisted of the extensive £4m redevelopment of the school’s sports facilities. The facilities include eight outdoor cricket lanes with various artificial surfaces, one and a half new hockey…

Rudding Park Hotel & Spa, Harrogate

Project brief Adept was appointed to carry out civil and structural designs for a spa expansion adjacent to the Grade 1 Listed hotel. Our designs encompassed structures for the main…

Accrington Academy – Phase 2

HTC architects have consecutively appointed Adept on behalf of Accrington Academy for the construction of four now completed projects. Sympathetic engineering solutions were required to adapt to the needs of…

Accrington College Swimming Pool

The project involved the construction of a single storey building to provide a swimming pool facility in Accrington. The swimming pool was to be of a standard which could be…

  • Policies & Certificates
  • Social Value

Email: inbox@adeptcsce.com

Web: https://adeptcsce.com

Find us on:

ADEPT CSCE

Leeds Office
Unit 2, 1912 Mill, Sunny Bank Mills,
Leeds, LS28 5UJ
Tel: 0113 239 4518

London Office
140 Goswell Road,
London, EC1V 7DY
Tel: 0203 007 7497


Hull Office
C4DI, @TheDock,
31-38 Queen Street,
Hull, HU1 1UU
Tel: 01482 770 155

Manchester Office
7 St James Square, 4th Floor,
Manchester, M2 6DN
Tel: 0161 974 0291


Birmingham Office
Griffin House,
18-19 Ludgate Hill,
Birmingham, B3 1DW
Tel: 0121 820 8809

Sheffield Office
3rd Floor, 1 East Parade,
Sheffield, S1 2ET
Tel: 0114 349 7119